Press Removal – San Angelo, TX
Confined Space Dismantling. Safe Rigging. Full Salvage Recovery.
MIWEC executed a high-stakes press removal and equipment recovery operation in San Angelo, TX — managing confined space protocols, utility isolations, and structural floor integrity, all while maximizing asset recovery.
Project Details
- Client: Confidential Industrial Operation
- Location: San Angelo, TX
- Scope: Multi-phase dismantling, rigging, confined space entry, floor slab protection
- Recycled: Stainless steel, copper, carbon steel, coated metal
- Outcome: Delivered safely with zero incident reports, and full post-removal site clearance
Scope of Work Summary
The project involved confined space entry and mechanical separation of press foundations, specialized rigging to protect floor integrity, crane-assisted equipment haul-out, salvage coordination, and complete site closure support. MIWEC mapped all utilities, applied OSHA lockout/tagout procedures, and delivered the site in broom-swept, leasable condition.
Recovered: Equipment steel, stainless, alloys, electrical, copper, hydraulic units.
Explore Related Press Projects
Press Removal – Springfield, MO
Multi-phase removal of legacy press lines, ink drainage, and compliance oversight.
CTI Paper USA Press Removal
Precision dismantling, fluid removal, and resale management for press components.
Press Removal – Jacksonville, FL
Engineered deactivation and rigging strategy implemented for a large-scale closure.
Have a Press to Retire in Texas or Beyond?
MIWEC provides nationwide turnkey press line removals — from rigging and recycling to permitting and resale. Let us help you reduce liability and unlock recovery value.
Firm’s Legal Name
MIWEC Asset Recovery Inc.
Address
273 Walt Whitman Rd, Ste 125
Huntington Sta., NY 11746