Press Removal – San Angelo, TX
Confined Space Dismantling. Safe Rigging. Full Salvage Recovery.
MIWEC executed a high-stakes press removal and equipment recovery operation in San Angelo, TX — managing confined space protocols, utility isolations, and structural floor integrity, all while maximizing asset recovery.
Project Details
- Client: Confidential Industrial Operation
- Location: San Angelo, TX
- Scope: Multi-phase dismantling, rigging, confined space entry, floor slab protection
- Recycled: Stainless steel, copper, carbon steel, coated metal
- Outcome: Delivered safely with zero incident reports, and full post-removal site clearance
Scope of Work Summary
The project involved confined space entry and mechanical separation of press foundations, specialized rigging to protect floor integrity, crane-assisted equipment haul-out, salvage coordination, and complete site closure support. MIWEC mapped all utilities, applied OSHA lockout/tagout procedures, and delivered the site in broom-swept, leasable condition.
Recovered: Equipment steel, stainless, alloys, electrical, copper, hydraulic units.
Explore Related Press Projects
Press Removal – Springfield, MO
Multi-phase removal of legacy press lines, ink drainage, and compliance oversight.
Press Removal – Rockford, IL
Full equipment dismantling and salvage in a high-clearance facility.
Press Removal – Jacksonville, FL
Engineered deactivation and rigging strategy implemented for a large-scale closure.
Have a Press to Retire in Texas or Beyond?
MIWEC provides nationwide turnkey press line removals — from rigging and recycling to permitting and resale. Let us help you reduce liability and unlock recovery value.
Firm’s Legal Name
MIWEC Asset Recovery Inc.
Contact Info
Phone: 631-873-4357
Fax: 631-425-7638
Email: Sales@MIWEC-USA.com / Info@MIWEC-USA.com
Address
273 Walt Whitman Rd, Ste 125
Huntington Sta., NY 11746